Smart Solutions Case Studies

Muir-Chase Saves Caltech Gallons with High-Efficiency Zurn Urinals

Since Muir-Chase Plumbing installed Zurn Retrofit Pint urinal systems in every bathroom across campus, Caltech is saving 6,056,130 gallons of water and $42,393 per year. Californians know the value of every drop of water, and the world-renowned science and engineering institute in Pasadena recognizes the importance of being a responsible steward of water resources.

With Timetable Shortened Dramatically, MLP Turns to Zurn Plumbing Solutions

In urgent need of more space, Erie County Medical Center Corporation (ECMCC) shortened the construction timeline for its new long-term care facility from two years to 15 months. MLP Plumbing & Mechanical, Inc., of Cheektowaga, NY, met the challenge by relying on Zurn products. Zurn Industries, LLC, helped MLP eliminate contractor hours by providing customized, engineered solutions to fit jobsite dimensions and install easily. As a result, the ECMCC saved millions of dollars financing its $103-million project.

With Hurry-Up Offense and Zurn Products, Orlando’s Citrus Bowl Stadium Renovation Completed in Ten Months

When the scoreboard of the original Orlando Citrus Bowl Stadium was torn down in January 2014, the project team began a hurry-up offense to complete a roughly $200-million renovation in only ten months. Zurn Industries, LLC was drafted to provide its products and to meet the challenges of an expedited project timeline with made-to-order requirements.

U.S. Engineering Saves Time, Labor with Zurn Lean Construction Plumbing Solutions

Zurn Industries, LLC enabled U.S. Engineering Company to “move the chains” faster than usual during the rough-in phase of building a new stadium for Colorado State University in Fort Collins, CO. Patrick Barnett, project manager for U.S. Engineering, said Zurn’s lean construction practices provided “at least a 10-percent” labor savings for the company.