Smart Solutions Case Studies

Circulating Air ‘Amazed’ by Speed, Ease of Installing Uponor Radiant System

Describing the Circulating Air crew’s first experience using Uponor products, Job Foreman Matt Fitzgerald said, “We were truly amazed at how quickly and easily we installed the tubing for the radiant heating and cooling system.” The Los Angeles-based mechanical contractor’s four-man crew installed 16,000’ of Uponor’s Wirsbo hePEX™ tubing in a new research building on the campus of the University of California, Los Angeles (UCLA). Using the radiant heating and cooling system helped earn LEED® Gold status for the six-story, 100,000-square-foot Edie and Lew Wasserman Eye Research Center.