Dorvin D. Leis Says Aloha to Faster, Smarter, More Accurate MEP Layout Using Trimble Technology

After winning a renovation project to transform the Waikiki Trade Center into a 230-room contemporary Hyatt Centric hotel, the Dorvin D. Leis Company, Inc. (DDL), Hawaii’s largest mechanical contractor, decided to ditch the string and tape for the Trimble RPT600 paired with Trimble Field Link software. The cutting-edge technology helped DDL save time, increase productivity, and bring a constructible process from the office to the field and back again.

Arden Engineering Constructors Slashes Man-Hours by 90 Percent with Trimble Scanner and Software

For a recent retrofit, Arden Engineering Constructors knew that an accurate as-built assessment of the project was essential to ensure a smooth process, so they put their Trimble® TX6 Scanner and RealWorks® Office software to the test. The scan took one field worker about 4 hours, compared with an estimated 32-man hours for manual measurements—a labor savings of 90 percent.

North Mechanical Cuts $1 Million in Shared Costs by Using Trimble SysQue to Optimize Workflow

To speed the design and fabrication workflow for a customer’s research facility build, North Mechanical Contracting & Service used Trimble® systems, saving an estimated $1 million in costs and cutting by 400 percent the time that would have been needed for traditional materials takeoff tasks. The project required North Mechanical to generate material takeoffs and fabricate all mechanical and plumbing components for a laboratory building in south-side Indianapolis, IN. It represents the company’s largest fabrication contract to date for one of the area’s largest manufacturers.

Trimble Technology Proves Vital to Success of Prout Boiler, Heating & Welding, Inc.

Prout Boiler, Heating & Welding, Inc. relied heavily on Trimble’s AutoBid Mechanical and PipeDesigner 3D® to plan out a multitrade prefabrication approach during the bidding process for a hospital expansion project and take charge of multitrade coordination throughout the expedited construction schedule.

U.S. Engineering Fast-Tracks Project Using Trimble Technology

The new Mercy Hospital Joplin in Joplin, MO, is on schedule to open in 2015, thanks in part to efforts by U.S. Engineering. To meet the needs of this fast-track effort to replace the former St. John’s Mercy Regional Medical Center, destroyed on May 22, 2011, by an EF-5 tornado, U.S. Engineering used a host of Trimble solutions to establish one of the industry’s most efficient, accurate, and repeatable design-to-fabrication-to-installation workflows ever put in place on a hospital project.