Webinar #26: Using the MCAA’s Publication to Quantify CV-19 Loss of Labor Productivity on Your Project

August 4, 2020
There is no question the ongoing COVID-19 pandemic has impacted the construction and service jobsite productivity. In this expanded webinar John McNerney, Paul Stynchcomb, CCM, PSP, CFCC and Professor William Ibbs, Ph.D. of The Ibbs Consulting Group discuss MCAA’s newly updated Change Orders, Productivity, Overtime manual, and how to use the manual to quantify a loss of productivity (LoP) impact caused by COVID-19.

There is no question the ongoing COVID-19 pandemic has impacted the construction and service jobsite productivity. In this expanded webinar John McNerney, Paul Stynchcomb, CCM, PSP, CFCC and Professor William Ibbs, Ph.D. of The Ibbs Consulting Group discuss MCAA’s newly updated Change Orders, Productivity, Overtime manual, and how to use the manual to quantify a loss of productivity (LoP) impact caused by COVID-19. Being one of the most difficult processes, our panelists will guide you through the nuts and bolts of how to craft an LoP claim and the need for construction counsel to review contracts, government guidelines and current regulations. This webinar explores the project-specific LoP quantification methods and reviews which of the MCAA Factor categories are potentially applicable to the COVID-19 LoP impacts.

Additional Resources:

Editor’s note: The slides available for download contain the most recent and up-to-date calculations originally released in the MCAA’s Change Orders, Productivity, Overtime manual and corrects slide #40 in this webinar, recorded Tuesday, August 4, 2020.

Related Articles
MCAA hosted its first Field Leaders Conference of 2025 from May 12-14 in Washington, DC. With over 140 registrants, the event provided an engaging and impactful experience for emerging leaders in the mechanical contracting industry. MCAA’s next Field Leaders Conference will take place in Toronto, ON from September 15-17. Registration will open May 27, 2025.…
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
By swapping out Excel spreadsheets for MSUITE software across multiple fabrication shops, McCarl’s Industrial and Mechanical Contractors now has real-time visibility into their workflow, not the two-to-three-day lag time. Adopting a fully digital platform has optimized workflows and increased operational efficiency.…
Bruno is a Mechanical Engineering student at Fairleigh Dickinson University and graduating in May.  He is an active member of his student chapter, served as President, Vice President, and Recruitment Chair, and interned at MCAA Member, Mid-Atlantic Mechanical.  Post-graduation, Bruno will be continuing on at Mid-Atlantic as a full-time Project Engineer.…
Load More...