IMI TA’s Support Center Cuts Energy Costs at Oklahoma Public Safety Facility

June 19, 2023

In recent years, the power needed to heat or cool buildings has fallen dramatically with the focus on reducing energy consumption and minimizing the environmental impact of HVAC installations. The flow rates in our installations are much lower now than in the past, especially if we use modulating controls on the terminal units. Here, IMI Hydronic Engineering explains the issues around low flow rates in boilers, cooling units, and pumps; solutions to guarantee the minimum flow rate; and effective ways to control low flow rates.

Looking for More Smart Solutions?

Visit the Smart Solutions Case Studies area of our website! You’ll see how other mechanical contractors found their win-win with productivity-enhancing and cost-saving applications from members of MCAA’s Manufacturer/Supplier Council.

Plus, you’ll find tips and ideas on other ways you and your company can save money and enhance your productivity.

Related Articles
For 15 years, MSCA has proudly partnered with Convoy of Hope, coming together as a community to make a difference. Since our collaboration began, MSCA members have contributed over $750,000 in food, goods, labor, and financial support to this incredible organization. Join us at MSCA25 as we celebrate our partnership by giving back, and read on to learn how you can donate to our efforts.…
MCAA hosted its first Field Leaders Conference of 2025 from May 12-14 in Washington, DC. With over 140 registrants, the event provided an engaging and impactful experience for emerging leaders in the mechanical contracting industry. MCAA’s next Field Leaders Conference will take place in Toronto, ON from September 15-17. Registration will open May 27, 2025.…
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
By swapping out Excel spreadsheets for MSUITE software across multiple fabrication shops, McCarl’s Industrial and Mechanical Contractors now has real-time visibility into their workflow, not the two-to-three-day lag time. Adopting a fully digital platform has optimized workflows and increased operational efficiency.…
Load More...