Resource Highlight: MCAA’s Project Manager’s Manual

March 5, 2021

Each week, MCAA will highlight one or more of the educational resources that are free to MCAA members as a benefit of membership. This week, we focus on MCAA’s Project Manager’s Manual. This manual covers all aspects of mechanical industry project management, including key topics like managing change orders and claims, job cost and labor control, productivity, scheduling, safety and much more. In addition to guidance, explanation, and best practices, it includes templates and examples of commonly used forms and documents like a Short Interval Schedule.

DOWNLOAD

You might also like these related resources:

And don’t miss these educational opportunities:

Related Articles
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
The complexity of longer, more elaborate pipe systems, paired with the urgency of getting a business back up and running, makes having the right tools for commercial plumbing repairs essential. You need tools with the appropriate power and size capacity to complete jobs, enough cable to ensure they can reach the end of longer pipes, and extra cable flexibility to allow navigation of longer pipe runs. Along with finding tools with these general features, here are five basic tools you should invest in for commercial work:…
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
W.W. Gay Mechanical Contractor, Inc. saw a 200-percent increase in shop productivity and a 12-fold increase in weld productivity by implementing Novarc Technologies Inc.’s collaborative Spool Welding Robot (SWR). They are also realizing a 100-percent pass rate on radiography tests (RTs). The SWR has reduced W.W. Gay’s dependence on highly skilled welders, of whom there is a global shortage.…
Load More...