Re-Opening Buildings Safely After COVID-19 Shutdown

April 22, 2020

As buildings are reopening after being shut down or used less during the pandemic, there is an inherent risk to the water and air systems. MCAA has drafted a comprehensive sample letter for our contractors to download and customize as needed before sending to building owners as they prepare to re-open their buildings in the safest way.

TEMPLATE LETTER
Related Articles
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
On-the-job safety hazards are a constant risk for mechanical contractors, with some of the most frequently reported injuries coming from routinely used tools and equipment. A few simple precautions can go a long way toward helping maintain health, say the experts at Ridge Tool Company.…
The Women in the Mechanical Industry (WiMI) Conference is your platform for building lasting connections and fostering a supportive community. Networking opportunities abound, allowing attendees to connect with like-minded professionals, share experiences, and collaborate on strategies for success. Register today!…
The Manufacturer/Supplier Training area of MCAA’s website connects our contractor members with training opportunities available from the members of MCAA’s Manufacturer/Supplier Council.…
Load More...