Smart Solutions Case Studies

Hill York Meets Growing Campus’ Energy Demands with BAC’s Innovative, Efficient Ice Thermal Storage

With 26,000 students and a growing campus, Florida’s Nova Southeastern University (NSU) was challenged with finding a reliable cooling system that kept both expenses and the environment in mind. Baltimore Aircoil Company (BAC) and Hill York mechanical contractors worked together to find a solution for NSU, finally settling on BAC’s innovative ice thermal storage. Now, NSU is reducing their peak electrical demand and saving electricity costs while remaining environmentally sensitive.

BAC Proves a Fruitful Choice for Doubl-Kold

Washington State had a record apple harvest in 2012, so Double-Kold of Yakima, WA, stepped up to expand storage capacity rapidly for growers across the state by relying on Baltimore Aircoil Company’s (BAC) products. After apples are harvested in the fall, they need to be stored in cold rooms for several months to supply various markets for the entire year.

With BAC Cooling Towers, H&R Mechanical Contractors Meets University’s Demands for Energy Efficient, Quiet Systems

When faced with the challenges of installing a quiet, energy efficient HVAC system for Eastern Kentucky University’s (EKU’s) new, state-of-theart science building, H&R Mechanical Contractors selected Baltimore Aircoil Company (BAC) PT2 Cooling Towers. The PT2 towers not only solve the energy challenges but are equipped with several features that keep noise to a minimum. The new campus facility, located in Richmond, KY, houses classrooms and labs for the departments of Chemistry, Science, and Physics & Astronomy.

Compact Footprint, Snug Fit of BAC Cooling Towers Makes Installation Easy for Ideal Consolidated

In selecting new cooling equipment for a university laboratory, Ideal Consolidated Inc., chose Baltimore Aircoil Company (BAC) cooling towers because they would stand up to harsh winters, but also for their ease of installation. Tim Stuver, project manager at Ideal Consolidated, said the small footprint of the BAC towers made installation and rigging more efficient and cost-effective than other options.

TG Gallagher Prescribes BAC Cooling Towers for Easy Installation, Efficiency

With only two consecutive weekends scheduled to replace Cambridge Hospital’s aging cooling towers, TG Gallagher selected Baltimore Aircoil Company (BAC) towers designed to make installation and upgrades easy. Recovering from one of the harshest winters in recent memory, the Boston-based hospital wanted to be prepared for their HVAC needs this summer, and they were looking for a more energy-efficient solution. The real challenge was getting the old towers removed and the new towers installed in the short timeframe while working around the busy Cambridge neighborhood streets.

Getting the Best Performance From Your Evaporative Cooling Equipment

Building owners and property managers have a lot at stake in their investments, so they look to their MCAA contractors for solutions. When evaluating mechanical equipment, hassle-free operation and long equipment life are important parts of the purchase equation — here are five ways to enhance the performance of evaporative cooling equipment and save on energy costs.