Smart Solutions Case Studies

BMWC Safely Executes a Heavy Lift, Thanks to Lifting Gear Hire

For a challenging project with a short timeline, BMW Constructors, Inc. (BMWC), partnered with Lifting Gear Hire (LGH), who not only supplied the appropriately sized, tested, and certified lift equipment but also expertise in developing a lift plan. As a result, BWWC set two 15’ x 52’ cooling tower unit sections inside an active, working refinery without disrupting day-to-day operations, completing the project on schedule and under budget. In addition to coordinating placement and use of a 550-ton crane, submitting an engineer lift plan for approval, and preparing the site to meet the project soil compaction requirements, BMWC was also responsible for removing the HVAC/scrubber units.