Smart Solutions Case Studies

With Daikin, Olson Plumbing and Heating Stands Up COVID-19 Care Facility in Record Time

Olson Plumbing and Heating partnered with Daikin Applied to retrofit a Colorado medical center to house patients recovering from COVID-19, moving from planning to project completion in just 30 days. In response to the rapid spread of the pandemic, St. Mary-Corwin Medical Center in Pueblo, CO, was redesigned to provide post-COVID-19, non-critical, isolated care, freeing up intensive care isolation units in other facilities. Daikin is a sponsor of MCAA’s 2021 Virtual Education Conference.

Olson Plumbing and Heating Weathers Challenges of Pikes Peak Project with Viega ProPress

Prefabrication was just one of the ways that Olson Plumbing and Heating leveraged Viega ProPress to take on a mountain of a project: building a new visitor’s complex at the summit of Pikes Peak that met strict environmental standards … during the COVID-19 pandemic. “We prefabbed all the domestic and hydronic piping, as much as we could, to minimize labor at the top,” said Josh Crippen, superintendent at Olson. “We prefabbed our pump skids, all the water heater and boiler skids, all the waste and vent piping. As much as possible.”