HOLDRITE Products Solve Jobsite Challenges for PAR Plumbing

July 6, 2017

When PAR was contracted to provide all of the plumbing for Riverside K, a 32-story luxury condominium on Manhattan’s West Side, they knew that space inside the walls would be tight. HOLDRITE support systems made for a simpler installation while also saving PAR time.

LEARN MORE

Looking for Solutions to Your Installation Challenges?

Visit the Smart Solutions Case Studies area of our website! You’ll see how other mechanical contractors found their win-win with productivity-enhancing and cost-saving applications from members of MCAA’s Manufacturer/Supplier Council.

Plus, you’ll find tips and ideas on other ways you and your company can save money and enhance your productivity.

VISIT SMART SOLUTIONS

Related Articles
Faced with the possibility of losing money on a building expansion project, Braconier Mechanical and Plumbing found that using Viega products was an easy way to trim costs. The ease of installation with the Viega press approach cut installation time dramatically, bringing costs back under control. In addition, Viega turned out to be a better choice for a job where the original specs called for threading pipe.…
While renovating a historic building, Commonwealth Plumbing found that Viega’s double drop elbows were the best solution for accommodating new bathroom sinks in a tight space with limited design options. By using pressed fittings, Commonwealth not only saved time on installation but also avoided soldering in an old building with a lot of wood.…
Contracted to design and install the mechanical, electrical, plumbing, and fire protection systems for a massive renovation, Arden Building Companies faced a tight timeline, a tight space, and a tight budget—all of which made welding a poor choice for completing the mechanical room. Using Victaulic’s easy-to-install grooved connections, Arden joined, hung, and installed pipe quickly and efficiently once it was lowered into the mechanical room. Arden estimated that the speed of installation reduced overall costs by approximately $100,000.…